The Challenge

Platinum Hydraulics were commissioned by CC Group Plumbing & Drainage to provide the hydraulic design for the Trade Waste Arrestor package for the new Westfield Coomera Shopping Centre precinct in South East Queensland.

Challenges with this particular site included deep invert levels which create significant hydrostatic pressures.

Due to the highly specified engineering of the Australian Tanks heavy duty anti-floatation designs, no further structural engineering for the application was required, therefore saving time and costs when compared to the original specified product

The Arrestors for this site were pre-approved by Gold Coast City Council and consisted up to 16,000Litres which allowed for multiple tenancy connections, as opposed to the costs involved in installing multiple units as originally specified on the development plans.

The Solution

Australian Tanks, having recently been added to the Gold Coast City Council list of approved treatment devices, proposed in conjunction with Platinum Hydraulics a solution built on its current range of Heavy Duty precast concrete tanks.

In effect, we were able to tick the boxes on all of the application parameters with the added bonus of offering more treatment capacity (up to 16kl) allowing for the multiple tenancy connections.

Site: Westfield Coomera Contractor: CC Group Plumbing & Draininage Client: Platinum Hydraulic Design Project: Trade Waste Arrestors - Grease Traps Location: Coomera, Gold Coast, Queensland

To ensure that all devices were compliant, Australian Tanks worked closely with Gold Coast City Council to acquire pre-approval prior to supply and installation.

Working as a team, Australian Tanks, the contractor ‘CC Group Plumbing & Drainage’, and Platinum Hydraulics reviewed the original specification, calculated capacity requirements for each area, designed the individual tank capacities, then applied for the Gold Coast City Council approval.

The Result

»» Fully operational Trade Waste Package solutions provided within specified time frame.

»» Fully compliant with all local council regulations.

»» Manufactured to Australian Standards AS5100.2 Anti-floatation, Trafficable by a fully loaded semi-trailer

»» Delivered in time, and on budget.

Testimonial

Platinum Hydraulic Design are proud to be collaborating with CC Group Plumbing & Drainage for the new Westfield Coomera Shopping Complex Development.

Throughout the design phase, we were faced with particular challenges to overcome local authority requirements pertaining to the grease interceptor traps. Australian Tanks welcomed these challenges, and set out to provide a bespoke solution to the issues.

The professional manner in which Australian Tanks approached this project resulted with the successful installation of several large capacity grease interceptor traps that are fully compliant with the City of Gold Coast Trade Waste Department requirements.

Congratulations to Les Green, Henry Hape and Team for the professionalism, and a quality product.

Adam Williams
Managing Director


Posted By CC Group on 13th December 2017

Updated : 13th December 2017 | Words : 462 | Views : 2981

RSS Twitter Facebook
Trade Waste Arrestors - Grease Traps
Trade Waste Arrestors - Grease Traps
Trade Waste Arrestors - Grease Traps

Comments

Login to the Blog OR Register FREE

Username or Email Address

Password

Remember Me

Queens Wharf Early Works for QUU

Matt Harris and his team were commended following the completion of the water mains diversions they . . .

Posted By CC Group on 9th December 2019

Views : 2256 | Comments : 0

Australian Tanks Project Case Study

Overview Site: Westfield CoomeraContractor: CC Group Plumbing & DraininageClient: Platinum Hydr . . .

Posted By CC Group on 13th December 2017

Views : 2981 | Comments : 0

Services Trades Major Contractor of the Year 2016

Winning the Services Trades Major Contractor Award 2016 would not have been possible without the eff . . .

Posted By CC Group on 5th August 2016

Views : 2254 | Comments : 0

Share with Us

Twitter

Committed to providing a safe and healthy work environment